Developments

SUSD_0601_DG_11

Highwood Court
Harlesden

Acquired by SUSD in 2005, the site posed a range of planning and logistical challenges, which had to be overcome. By being bordered by 26 separate owners, a highly sensitive approach was required to resolve all the Party Wall and neighbour issues. Additionally access was complex due to the compact nature of the site, reachable [...]

Read more...

080124_WaterTower_CGI_LoRes1

Water Tower
West London

Inspired by the former industrial use of the area, this project utilises a redundant water tower and transforms it into a dramatic building for a prominent UK designer.

Read more...

080208_upper clapton render01

Upper Clapton Road
East London

On the site of a former recording studio a new mixed use development of flats and workshop space is under way in vibrant Clapton, East London. The building occupies a long and narrow site, which is used to its advantage for a series of different atmospheres from urban environment to intimate domesticity.

Read more...

IMG_5925

Towner Art Gallery
Eastbourne

After the gallery relocated to a purpose-built new space in 2005, SUSD has acquired the property and is currently investigating opportunities for redevelopment for affordable housing. As Harry is an Eastbourner by birth, this project is close to his heart.

Read more...

Folkestone

Project Name tbc
Folkestone

The site marks an important Gateway between the planned new harbour district, and the principal shopping area, on the corner of the historic promenade “The Leas” and is currently neglected by a closed façade.

Read more...

Lower Padworth - Perspective

Lower Padworth
West Berkshire

The proposed scheme is for three individual buildings containing 36 modern one and two bedroom apartments within a landscaped setting with green communal areas and associated car parking.

Read more...

Chipping Norton - 1

Chipping Norton
Oxfordshire

The design includes a community space and church hall on the ground floor with residential accommodation on the first floor and to the rear, all contained within the existing envelope. The project is currently at the detailed design stage with completion scheduled for 2011.

Read more...